Why are connection fees due if I’m already connected?
Connection fees are similar to impact fees and are based on usage type, not the physical connection to meter. The fees are your share of the cost for the Authority’s infrastructure.
How do I connect to water or sewer on my street if there are no mains?
You would need to install water or sewer facilities to the point of connection to the Authority’s main. Due to the Authority’s legal structure, we cannot finance the installation of new facilities in the same manner a municipality can. Please contact your local municipality to determine if they have a funding program to assist in the installation.
How many copies of plans or shop drawings do I need to submit?
We need two copies of all items submitted for reviews, one copy for our files and one copy for comments.
Can plans be submitted electronically?
One or two sheets is acceptable, larger sets require hard copies.
Do plans need to be sealed by an Engineer?
Florida statutes require all engineering drawings submitted for public record be signed and sealed by a Florida Professional Engineer unless marked “for review”. As-built drawings should be signed by a Surveyor.
Contact Us
Disclaimer:
Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.
Quick Links
FAQs
New Construction
Existing Service
Service Code
Project Forms and Exhibits
- Bill of Sale
- Easement Deed
- Shop Specifications
- Shop Specifications for Low Pressure Sewer Systems
- Statement of Capacity Letter
- Agreement for Deferred Payment of Additional Connection Charges
- Developer Agreement
- Memorandum of Developer Agreement
- Title Insurance Requirements
- Encroachment Agreement
- Low Pressure Sewer Main Extension Agreement
- Project Documentation
- Prerequisite Checklist for Preconstruction Conference
- Contractor’s License Verification
- Required Information on Record Drawings
- Lift Station Wet Well Caisson Construction Affidavit
- Low Pressure Sewer Lift Station Maintenance Agreement
- Low Pressure Sewer Main Ext Agreement Third Party Contingent Refund
- Water Main Extension Agreement Third Party Contingent Refund
- Water Main Extension Agreement Water Main Infill Plan
Why are connection fees due if I’m already connected?
Connection fees are similar to impact fees and are based on usage type, not the physical connection to meter. The fees are your share of the cost for the Authority’s infrastructure.
How do I connect to water or sewer on my street if there are no mains?
You would need to install water or sewer facilities to the point of connection to the Authority’s main. Due to the Authority’s legal structure, we cannot finance the installation of new facilities in the same manner a municipality can. Please contact your local municipality to determine if they have a funding program to assist in the installation.
How many copies of plans or shop drawings do I need to submit?
We need two copies of all items submitted for reviews, one copy for our files and one copy for comments.
Can plans be submitted electronically?
One or two sheets is acceptable, larger sets require hard copies.
Do plans need to be sealed by an Engineer?
Florida statutes require all engineering drawings submitted for public record be signed and sealed by a Florida Professional Engineer unless marked “for review”. As-built drawings should be signed by a Surveyor.
Contact Us
Disclaimer:
Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.
Quick Links
FAQs
New Construction
Existing Service
Service Code
Project Forms and Exhibits
Shop Specifications for Low Pressure Sewer Systems
Agreement for Deferred Payment of Additional Connection Charges
Memorandum of Developer Agreement
Low Pressure Sewer Main Extension Agreement
Prerequisite Checklist for Preconstruction Conference
Contractor’s License Verification
Required Information on Record Drawings
Lift Station Wet Well Caisson Construction Affidavit
Low Pressure Sewer Lift Station Maintenance Agreement
Low Pressure Sewer Main Ext Agreement Third Party Contingent Refund
Water Main Extension Agreement Third Party Contingent Refund